– Sanandaj power plant fire fighting water purification tanks
– Three Razi petrochemical sand filter tanks with a volume of 50 cubic meters
– Four sand filter tanks related to the third phase project of Abadan Refinery with a volume of 50 cubic meters and two sand filters and two active carbon tanks with a volume of 40 cubic meters
– Soda and acid tanks for the water purification unit of the third phase of Abadan Refinery
– Two sand filter tanks and two petrochemical active carbon tanks in Kermanshah, each with a volume of 15 cubic meters.
– Three soda and acid tanks of the Khark project
– Two sand filters and activated carbon polishing Isfahan
– Construction of deaerator tanks for daily fuel, condensate of Semnan and Shahrood combined cycle power plants
– Construction of storage and daily storage tanks for soda and acid, mixbed related to phases 22 and 24 of South Pars
– Construction of storage and daily storage tanks for soda and acid, mixbed related to phase 14 of South Pars
– Khuzestan Steel air storage tank with a volume of 20 cubic meters.
– Two 18-meter-long movable bridges of the sedimentation basin, 8 valves of the sedimentation basin
– Construction of Maroon petrochemical filter tanks
– Construction of a part of the cooling duct of Kerman power plant weighing 176 tons
– Construction of 23 water purification tanks of Damavand power plant and weight of 133 tons
– Construction of Khark project cartridge filter reservoirs
– Construction of fire water filter tanks for the Kashan power plant project
– Construction of all CPP and WTP tanks of Abadan 2 combined cycle power plant project
– Construction of all WTP tanks of Isfahan Terpekibi cycle power plant
– Construction of a part of WTP and CPP reservoirs of Jahrom combined cycle power plant
– Construction of six sand filter tanks and two activated carbon tanks for the Apadana Ceram project and the sand filter tanks of the Bandar Abbas power plant
– Construction of six carbon steel tanks for water purification in Ilam Gas Refinery
– Construction of seven RP liquefied gas tanks of 1300 Gachsaran
– Construction of a part of pre-heater and material grinding equipment of Firuzkoh cement factories, Ardestan, Ramhormoz, Ilam, weighing 854 tons.
– Making a part of Caspian wood equipment
– Pre-construction of 29 water tanks for fire fighting, pipelines and telecommunications
– Pre-construction of 9 oil storage tanks in Bushehr port
– Construction of steel duct for Khatoon Abad copper smelting project
– Construction of lenses for Jam and Mobin petrochemical project tanks
– Making 4 spherical lenses with a diameter of 5700 mm
– Construction of 4 petrochemical sand filter tanks in Maron, Ahvaz
– Steel tanks for Rabat Khorramabad mineral water project
– Water purification tanks of Basra Province, Iraq, a total of 14 units with a weight of 660 tons
– Construction of 8 sand and activated carbon filters at Zargan and Shahid Muftah power plants in Hamedan
– Construction of cartridge filters and structures related to phase 12 of South Pars
– Manufacture of cartridge filters and structures related to Hormozgan Steel
– Construction of cartridge filters and structures related to the acid tank of the water desalination project in Qeshm city
– Construction of two Khorasan steel tanks
– Construction of Al-Gormah-Basra water purification tanks, a total of 80 units weighing 175 tons
– Construction of four steel tanks of Shadgan
– Construction of 3 platform sewage skids (Sadra project)
– Two R.O for Salman oil platform
– Construction of 17 tanks for water treatment project of Yazd power plant
– Construction of 20 tanks for Sanandaj power plant water purification project
– Construction of 15 WTP tanks of Yazdfarab power plant water treatment project
– Construction of 8 units of mixed bed, soda and acid tanks, phase 14 of South Pars
– Construction of 22 tanks for water treatment project of Pere Sar power plant
– Construction of WTP-CPP reservoirs for water treatment project of Jender power plant in Syria
– Construction of WTP-CPP reservoirs of Ganaveh power plant water treatment project
– Construction of a sewage package for Caspian Industrial Town
– Construction of 6 sewage packages in South Pars Phase 16
– Construction of 4 sewage packages in South Pars 22
– Construction of 8 sewage packages in 19 South Pars
– Construction of 8 sewage packages in 24 South Pars
– Construction of Fresh water package, Phase 13 – South Pars – Asalouye
– Construction of Fresh Water package, Phase 14 – South Pars – Asalouye
– Construction of Fresh Water package, phase 17-18 – South Pars – Asalouye
– Construction of Fresh Water package, phase 22-24 – South Pars – Asalouye
– Construction of two closed tanks of Handichal project
– Ahvaz Paya Company
– Nik Refrigeration Industries
– Temperature converter company
– Khaniran company
– Behran Mebadar Company
– Garambasred company
– Arvand Tarash Abadan company
– Tehran Makabada company
– Serin Metal Company
– Super Active Company
– Exchange Makers Company
– Gostar Boran Exchange Company
– Semnan sodium carbonate company
– Construction of 100 tons of galvanized bolt and nut skeleton
– Construction of 200 tons of ducts (fireproof, anti-wear and material transfer) for the Shirgah project
– Construction of 126 tons of ducts for the cyclone dryer project for the Gilan project
– Construction of 9 CPP tanks for the Yazd Farab Power Plant water treatment project
– Construction of 22 reservoirs of Chadormello power plant
– Construction of 24 tanks of Kahnuj power plant